KINETIQBack to the build preview ↗

Draft reference · October 2026

Safety

Status: prototype design. It has not been built or load-tested yet. The aluminum prototype is being built now. Treat every number here as a design value until your own build has passed the tests below.

What can hurt you

Rules for every build

  1. Payout window in software. Home the drum fully wound at every power-up and set the payout limit (setup reference). The traveller's hard stops at each end of its rail are only a backstop for assembly and hand-turning: the lead screw is geared to the drum, so a stop hit under power locks the drum through the printed gears and can strip them.
  2. Keep the 3 dead wraps of rope on the drum at full payout. Never run the rope off the drum.
  3. Fuses rated 58 V DC: the 40 A MRBF main fuse, the 3 A regulator fuse and the 10 A charge fuse, in holders rated 58 V. Common 32 V automotive fuses and holders are not rated for this pack voltage.
  4. Bolted joints and adhesives. Loctite 243 on every screw into the frame's, drum's and rack cheeks' tapped edge holes. The drum flanges are bonded to the tube, and the hub and flanges to the shaft, with Loctite 638: no load for 24 h. Check the frame and rack-side screws after the load test.
  5. First power-up with the rope unloaded and nobody in its path: check the inrush at the power button (the BMS may trip; lengthen its short-circuit delay in the BMS app if it does), the drum's direction, the payout window, the over-voltage trip and the regen limit.
  6. Load test before training: hang a static load in steps up to 1.5 x your planned use, with nobody in the rope's path. Then test powered, starting light.
  7. Printed parts: print them in the specified materials, with the walls and infill in the printing reference, and print the fit coupons first. The screw-end tower must be printed on its side.

No warranty

The design is shared under the licenses in LICENSE.md without any warranty. You build and use it at your own risk.

A draft reference: the prototype is being built and tested, and the CAD, build files and software are released after testing.

Download Markdown source ↗